
For Delivery &
Construction Leaders.
Keep projects moving while ensuring the right evidence is captured along the way.
Controlled
completion,
not last-minute
reconstruction.
Delivery and Construction leaders are accountable for quality at the point liability begins. They need to demonstrate control of requested documents, compliance evidence and completion records delivered by contractors, vendors and suppliers.
Guided Home makes readiness visible before handover, with
any issues and defects rapidly resolved using Guided Home’s configurable digital inspection checklists, with defects routed back to the responsible contractor, reducing delays to resolution.

What changes for delivery and construction.
Assured
documentation at
completion.
Collate and structure all required documentation from partners, subcontractors and suppliers
before handover.
Less rework after
handover.
Track the status of issues and defects through Guided Home’s configurable inspection checklists so completion becomes a controlled process, not a reactive scramble.
Simpler supply chain
submissions.
Contractors and suppliers can quickly upload required documents and evidence against the packages they deliver, lowering handover administration by over 60% at scale.
How it is controlled
Guided Home governs evidence requirements across developers, contractors and operators.
Responsibility transfer is made explicit against defined readiness criteria, reducing portfolio-level risk and future dispute.

PARTNER TESTIMONIALS
Trusted at scale.
GET STARTED TODAY
Be assured. Be ready.
If you are responsible for delivery, quality, compliance or portfolio oversight, we would welcome a structured conversation before a demo so we can understand your requirements fully.
FAQs
Have questions?
How does Guided Home reduce latent defects exposure?
Latent defects – those not apparent at the point of handover – typically surface during the defects liability period or beyond. Guided Home reduces exposure by ensuring that completion evidence, inspection records and documentation are captured and preserved at source. When a latent defect is later identified, the original delivery record provides the evidence needed to determine responsibility, reducing dispute risk and accelerating resolution.
What happens to the completion record after practical completion?
At practical completion, the record created during delivery – including inspection evidence, certificates and documentation – becomes the foundation for the ongoing lifecycle record. Guided Home ensures this information carries forward into defects management, aftercare and future handovers rather than being lost across disconnected systems once the site team moves on.
How does Guided Home support construction document management?
Guided Home collates required documentation from contractors, suppliers and delivery partners against configurable checklists. Rather than chasing documents at the last minute before handover, the platform tracks submission status throughout delivery. This reduces the administrative burden at practical completion and ensures documentation is structured, complete and connected to the correct plot.
Can Guided Home issue a practical completion certificate?
Guided Home governs the evidence and readiness criteria required before a practical completion certificate is issued. Configurable completion checklists define what documentation, inspections and approvals must be in place. The platform makes readiness visible so that when practical completion is certified, the decision is supported by a clear, defensible record.
How does Guided Home improve construction quality assurance processes?
The platform provides configurable inspection checklists and structured defect capture workflows that standardise quality assurance across sites and delivery partners. Issues identified during inspections are routed back to the responsible contractor with full context, reducing resolution time. The continuous record means quality evidence is preserved beyond site close-out, supporting any subsequent audits or disputes.





